A tour coach beside a small coned-off parking work area at a Japanese station

Shimoyoshida Station Bus Parking Partly Closed September 25: Group Travel Alert

Travel News Watch

Information checked: September 14, 2026, 8:31 AM JST.

Fujikyu Railway says part of the large-bus parking area beside Shimoyoshida Station will be unavailable while construction is carried out on Friday, September 25. The notice matters mainly to tour groups and charter-coach operators using the station for access to the Chureito Pagoda and Fujiyoshida area.

Short answerThe partial closure runs from 8:00 AM to 6:00 PM on September 25. The operator says the affected area can be used again from 9:00 AM on Saturday, September 26. Rail services are not described as suspended in this parking notice.

Key Facts For Travelers

Affected placePart of the large-bus parking area adjoining Shimoyoshida Station.
Restriction periodFriday, September 25, 2026, from 8:00 AM to 6:00 PM.
Planned reopeningSaturday, September 26, from 9:00 AM.
Who should actCharter-bus companies, tour leaders, and groups arranging coach pickup or drop-off.

What The Notice Changes

Only a portion of the large-bus area is listed as unavailable. The official announcement does not say that Shimoyoshida Station or the Fujikyu Railway Line will close, so ordinary rail passengers should continue to check the separate live train-status page for service information.

The operator publishes a diagram showing the work zone. Group organizers should send that official diagram to the driver and confirm the day’s stopping instructions rather than assuming the usual bay will be available.

Parking Rules For Tour Coaches

Fujikyu Railway’s standing parking guide says Shimoyoshida has coach spaces but no day-parking facility for ordinary cars. Coach parking is normally first come, first served without reservations and costs JPY 3,000 per vehicle.

Because capacity will be reduced during the work, a coach party should not build a tight sightseeing schedule around guaranteed parking. Confirm the arrangement with the railway or tour operator before departure and allow time for instructions on arrival.

Plan Pickup And Drop-Off Carefully

Shimoyoshida Station is the rail stop signed for Chureito Pagoda, so the forecourt can be busy with visitors and tour vehicles. Keep passengers together, use only the assigned stopping area, and avoid waiting on nearby roads.

If your itinerary reaches the station after 9:00 AM on September 26, the operator expects normal access to return. Recheck the official notice shortly before travel in case construction timing changes.

Traveler Actions

  • Share the official closure diagram with the coach company before September 25.
  • Confirm a pickup, drop-off, and waiting plan instead of assuming the regular bus bay is available.
  • Allow extra arrival time for staff directions and reduced parking capacity.
  • Do not use ordinary-car spaces or nearby roads as an improvised bus waiting area.
  • Check the railway’s current notice again before the trip.

Official Sources

Update History

  • September 14, 2026: Created from Fujikyu Railway’s current construction notice and station-parking guidance; affected area, closure hours, reopening time, coach rules, and station details checked.