Information checked: September 13, 2026, 8:35 AM JST.
Yamanashi Prefecture says the Yoshida Route between the summit and Izumigataki in the fifth-station area, plus the summit-to-Sato-goya descent route, entered winter closure at midnight on Friday, September 11. The official climbing season has ended, and summit attempts should not be planned.
Key Facts For Travelers
The Summit Route Is Out Of Season
The official Mt. Fuji site states that the 2026 climbing season has ended and the mountain is not open to the public for summit climbing. Mountain huts, upper-route toilets, rescue posts, and seasonal support services are no longer operating as they do during the summer season.
A clear road to the fifth station does not mean the summit trail is open. Road access, fifth-station sightseeing, and climbing-trail status are separate decisions managed by different operators.
What Remains Open Below
Yamanashi Prefecture lists the 0.6-kilometer link from Izumigataki to Sato-goya and the 0.8-kilometer link from Izumigataki to Fuji Subaru Line Fifth Station as open until a planned November 1 closure. Snow or other conditions can move that closure earlier.
The longer lower trail from Sato-goya to Nakanochaya is also listed as passable, but the prefecture specifically warns about fallen trees and rockfall. This is not an invitation to continue upward into the closed summit route.
Plan A Fifth-Station Visit Separately
The official season guide lists the fifth-station information center from 9:30 AM to 4:30 PM during the September 12-October 31 off-season period. Other shops, buses, toilets, and the Fuji Subaru Line can have separate hours or weather restrictions.
Check the road and bus operator on the day, carry warm layers, and leave enough daylight for any lower-trail walk. Autumn weather on Mt. Fuji can change rapidly even when conditions around the lakes are mild.
Traveler Actions
- Do not attempt the summit or enter any section marked closed after September 11.
- Check both the prefectural trail notice and the Fuji Subaru Line road status before departure.
- Treat lower open sections as mountain terrain with rockfall and fallen-tree hazards.
- Confirm toilets, transport, and facility hours independently for a fifth-station visit.
- Carry warm clothing and finish lower walks well before dark.
Official Sources
- Yamanashi Prefecture official Yoshida Route notice: September 11 winter closures, lower open sections, hazards, and November 1 plans
- Official Mt. Fuji climbing site: 2026 season dates, service closures, and fifth-station information-center hours
- Official Mt. Fuji climbing site: post-season hut, toilet, and trail-maintenance warnings
Update History
- September 13, 2026: Created from Yamanashi Prefecture’s current Yoshida Route closure notice and official Mt. Fuji season guidance; closed and open sections, hazard notes, planned November 1 closures, and off-season information-center hours checked.







